Wednesday, October 22, 2008

Conceptual Bent


Evening fellow barn builders-

I realize that this particular bent is neither within our time frame nor necessary for this building, but I spent some time trying to come up with a way to have four beams intersect at 90 degree angles on top of a single post tightly, and this was what I came up with. If the beams coming in from the top right and bottom left of the picture were put in place first, than the flat half of the butt end of the other two beams (the bottom, in their cases) would hold the tails tight against the pins, and the same in reverse. Just playing around with post and beam concepts. I think that what we will do is probably have the posts rise straight up to the ceiling, which allows us to simply have 4-way mortise and tenon attachments, with a 1/2 inch or so taken out of the post all the way around to give the beams a lip to rest on. Is there some glaring reason that my bent would not work or that my concept of what we should actually do is mistaken?

quasso regimen, carpe iter.

trevanion

No comments: